main index

P00: frame around

P01: olicognography

P03: infrastructures

wayout:contact

Registers of application docs

culverts

erosionprevention

*text *

urbangasol.

Similar user docs

roadlayers

build&streets

*text*

gasolineconsumpt.

Roads Characteristics


Common roads for european vehicles

roads for safety or northamericans vehicles


highway

road

high traffic

low traffic

highway

road

high traffic

low traffic

speed limits

120

100

80

80

120

100

80

80

cyclists

no

no

no

yes

no

no

no

yes

small engines

no

no

yes

yes

no

no

yes

yes

common traffic

no

variable

yes

yes

no

variable

yes

yes

crossings

no

yes

yes

yes

no

yes

yes

yes

with central way

7.95-8.35

6.75

6.75

4.5 - 5.5

8.45

6.85

6.8

5.5

width way lateral

3.5

3.1

3.1

2.75

3.5

3.25

3.25

2.85

width marks

0.15 - 0.20

0.1

0.1

spec.

0.2

0.15

0.15

spec.

width lateral side

0.6-1.1

0.35

0.35

spec.

1.1

0.35

0.35

spec.

with emergency way

3.5 - 4

np

np

spec.

4

nd

nd

spec.

lines

yes

yes

yes

spec.

yes

yes

yes

spec.

pathways line number

2 x 2

2x2 - 1x2

1x2

1

2 x 2

1x2

1x2

1

spacebetween ground marks

0.1-0.15

0.1

0.1

0.1

0.15

0.15

0.1

0.1

central marks

3 - 9

3 - 9

3 - 9

3 - 9

3 - 9

3 - 9

3 - 9

3 - 9

cyclists way width

np

np

variable

1.25

nd

nd

nd

1.25

Roads hierarchy and width dimension European case (smaller cars & lorries)

Typical friction coefficients


width min. m

pavement

parking

2 ways

3 ways

4 ways

material


regional, mains roads

15

avoid

each .. km

avoid

avoid

prefer

metal on metal

0.15-0.2

secondary roads

9.5

si

eventually

yes

eventual

avoid

mason./ masonery

0.6-0.7

Primary avenues

13

eventually

eventually

avoid

eventual

prefer

metal/masonery

0.3-0.7

Streets

14

yes

yes

yes

eventual

2 lines of trees

metal/wood

0.2-0.6

pavement

0.6

0.6

eventually

x 2

x 2

avoid

wood/wood

0.25-0.5

protected central way

variable

eventually

eventually

nd

nd

yes

gum/concrete

0.5-0.9

margin, lateral side

after vehicule

separated

2.4

2.7

1.8

1.8



lateral way

1.8

yes

yes

nd

x 2

x 2



central way

3

no

no

avoid

3.3

separate



total minimum withou lateral side

23

27

30



total minimum with lateral sides

33

42

46



Roads layers




Central ways

(slope 2%)

Lateral sides borders

traffic

subbase

base

intermediate layer

running layer

subbase

base


heavywieght/highway

soil concrete

gravel concrete

bitumen mix

bitumen mix

natural sides

soil concrete



20 cms

22 cms

9 cms

5 cms

35 cms

20 cms


Intermediate

natural sides

artificial sides

bitumen mix

bitumen mix

natural sides

double superficial treatment



25 cms

25 cms

12 cms

6 cms

25 cms

6cms


low

natural sides

macadam

double superficial treatment

natural sides

natural sides




25 cms

20 cms

6 cms

25 cms

20 cms



road concrete layers




(slope 2%)




Traffic

subbase

base

intermediate layer


subbase

base

double superficial treatment

heavywieght/highway

natural sides

gravel concrete

concrete


natural sides

bitumen mix



20 cms

15 cms

23 to 27 cms


35 cms

27 cms


Intermediate

gravel concrete

concrete


concrete

natural sides

lateral drains

double superficial treatment


15 cms

23 cms


27 cms

15 cms

23 cms


low




concrete

natural sides







20 cms

20 cms



Road design maximum curves friction & maximum radius of road

Roads Loads and speed design

speed (km/h)

curvature m/m

Friction coef

minimum radius

maximum curvature degree

Flows

minimum

maximum

48

0.06

0.22

83

7

vehicules /day

200


80

0.06

0.2

254

2.5

load/way (ton)

10.5


112

0.06

0.18

553

1

design for speed (km/h)

30


48

0.12

0.28

65

9

speed of use (km/h)


20

80

0.12

0.26

195

3




112

0.12

0.24

415

1.5




Streets Public Light

Roads minimum visibility distance (m)

road type

height

power (watts)

starting light flow (lumen)

Speed (km/h)

48

80

112

Main access road A

30 m

150

Distance visibility when not moving

61

107

183

Main access road B

24

150

2 ways ahead visibility distance

244

518

700

roadways & bridge central way, duct

24

150


embankment


via secund D

18

200

bank foundation or land fill

0 - 1.5

4 a 1


via secund E

18

400

intern roadways

1.5 - 3

3 a 1






industrial plant roas

> 3 m

2 a 1


Places of use docs

sewage

airpollution

*text*

riskscorrel.