Roads & Pavments Indicative Unitary Costs for Democratic Management (page 1/2)

Type of cost

cost for

concept

lower Unit

low cost low/u

low cost high/u

low unit quantity

Discrepancy left/right

high unit

High cost /u low

High cost /u high

High unit quantity

Suggested amount to work with

pavment

construction

road base for asphalt (10cms) main road (10 m - 7.2 m width) & seal asphalt layer& gravel

m

3.2

4.1

11320

0.184

30

38

1000

41120

pavment

construction

road excavation structures

0.174

0.510

78954

0.833

m3

1.6

1.7

2721

26982

pavment

construction

excavation 50cms (load & boot a 200 m) main road (10 m - 7.2 m width)

2.1

6.7

1441

-42.987

m3

30

82

5000

6353

pavment

construction

road pothole patching, depression filling

28

34

10000

0.000

ton

193

287

1278

306781

pavment

construction

road pedestrial and bicycle (3 m) cover & other

m

2.5

2.8

10033

0.000

7.8

10.0

3000

26730

pavment

construction

road improvment ampliation

cap

8.3

14.4

2500

-11.620

m

35

36

10000

358106

pavment

construction

road underground filling imported gravel

cap

0.711

2.416

2196

0.835

m3

5.2

5.4

106

3433

pavment

construction

road asphalt concrete bottom course construction 5 - 6 cms

18

22

10000

0.000

ton

129

156

1397

199260

pavment

construction

road asphalt milling, concrete pavement

m

0.80

1.11

10000

-8.229

7.5

10.1

10000

88031

pavment

construction

road granular subbase

cap

7.1

24.2

6210

0.011

m

95

97

1000

97075

pavment

construction

road pothole patching

m

29

30

10000

-0.038

28

34

10000

306781

pavment

construction

asphalt cold recycling 6cm

m

0.95

2.94

10000

-8.193

8.9

26.9

10000

178854

pavment

construction

road concrete

m

3.7

5.0

50000

-0.513

m

47

58

6290

329607

pavment

construction

asphalt & application

29

47

10000

0.000

ton

142

323

1633

379800

pavment

construction

asphalt concrete joints milling crack sealing with bitumen

m

1.2

3.4

10000

-3.245

7.8

12.0

10000

117919

pavment

construction

road excavation & preparation

m

77

81

3000

-3.667

71

76

15000

1105575

pavment

construction

road 6 highway remixed

m

12

13

18965

0.000

m

188

169

1293

230710

pavment

construction

road steel structure

m

0.629

0.672

12630

0.000

0.730

0.913

10000

8213

pavment

construction

road soil equiped area

cap

10

24

870

0.838

3.2

3.3

746

14802

pavment

construction

building sum. hot mix asphalt application

cap

0.505

0.551

16907

0.000

ton

6.0

6.0

1500

8925

pavment

construction

concrete pavment & street sides

m

25

27

10000

0.000

m3

77

99

2959

259995

pavment

construction

road 4 ways prefinish

m

70

75

5869

0.040

1.5

1.8

250000

425536

pavment

construction

road raised area 20cms layers construction

m

0.383

0.422

10000

0.000

1.3

1.4

2881

4026

pavment

construction

road highway 6 highway cover full

m

20

22

18965

0.000

23

30

15000

398498

pavment

construction

road 8 m remixed

m

3.6

4.9

50000

0.274

m 4 ways

59

65

2500

152868

pavment

construction

road single surface dressing

cap

4.4

7.5

14654

0.000

5.1

12.3

10000

87037

pavment

construction

road asphalt cold mix mediums

m

1.6

1.8

12650

0.000

1.8

2.4

10000

21162

pavment

construction

road asphaltic hot mixed & adherence

m

1.2

1.3

11696

0.000

ton

13

15

1034

14591

pavment

construction

road local (6 m) asphalt cover on gravel

m

1.3

1.4

10000

-5.552

8.6

9.3

10000

89301

pavment

construction

road asphalt concrete levelling course construction 3 - 6cms

10

25

10000

0.000

ton

12

162

2030

176256

pavment

construction

asphalt remix technology (milling+hot mix)

m

1.8

1.8

10000

-8.244

17

17

10000

167585

pavment

construction

roads double surface

cap

7.4

15.5

15186

0.000

8.6

26.2

10000

174316

pavment

construction

road plan of trailor 10cms thick

cap

5.4

13.7

6175

0.832

3.3

3.6

2880

58756

pavment

construction

road stone 2 layers10 cms main road (10 m - 7.2 m width)

m

0.98

1.08

26784

0.000

2.5

3.0

10000

27560

pavment

funcional

pavment pcc 25cms thick

4.2

4.2

29544

-0.073

m3

90

206

900

123936

road transport

construction

park reforestation roadsides

cap

4.7

9.4

835

0.900

0.099

0.137

5000

5886

road transport

funcional

transport work

cap

141

172

835

0.900

2.2

3.0

5000

130795

road transport

funcional

roads common public spending on

cap

254

468

6144

0.000

240

293

8333

2219852

road transport

funcional

road 4 ways maintenance

cap

104

209

8192

0.898

/ cap.year.km

5.0

5.5

25000

128294

roads side equipment

construction

concrete boxes, protection ducts, opening, drain

cap

13

16

5000

0.000

m3

130

167

500

74337

roads side equipment

construction

road side & pathway

m

45

55

1000

0.000

1.4

1.4

36000

49599

roads side equipment

construction

drain shell

cap

26

53

205

0.784

unit

96

162

14

8122

roads side equipment

construction

sewage road culvert drain small

cap

105

195

156

0.797

m3

194

298

19

23504

roads side equipment

construction

concrete drains, culverts

cap

64

78

10000

0.000

m3

118

119

6000

709730

roads side equipment

construction

road tunnel of services

cap

14

17

15000

0.000

m

23

24

10000

237675

roads side equipment

construction

road pipe polyethylene pipe 30cms

m

14

21

875

-3.986

km

137046

167501

0.50

76137

roads side equipment

construction

box of perforation 2'x6'' 4 ways road

m

90

119

281

-4.359

km

4.8

5.9

29306

157059

roads side equipment

construction

road side fence vial 4 ways road

m

2.0

2.2

2000

0.000

km

3799

4643

1.0

4221

roads side equipment

construction

road access primary with control hydrologic

cap

3.1

3.8

15000

0.000

m

5.2

5.3

10000

52467

roads side equipment

construction

road planting

m

50

61

1000

0.000

1.5

1.6

36000

55896