Roads & Pavments Indicative Unitary Costs for Democratic Management (page 1/2) |
||||||||||||
Type of cost |
cost for |
concept |
lower Unit |
low cost low/u |
low cost high/u |
low unit quantity |
Discrepancy left/right |
high unit |
High cost /u low |
High cost /u high |
High unit quantity |
Suggested amount to work with |
pavment |
construction |
road base for asphalt (10cms) main road (10 m - 7.2 m width) & seal asphalt layer& gravel |
m |
3.2 |
4.1 |
11320 |
0.184 |
mē |
30 |
38 |
1000 |
41120 |
pavment |
construction |
road excavation structures |
mē |
0.174 |
0.510 |
78954 |
0.833 |
m3 |
1.6 |
1.7 |
2721 |
26982 |
pavment |
construction |
excavation 50cms (load & boot a 200 m) main road (10 m - 7.2 m width) |
mē |
2.1 |
6.7 |
1441 |
-42.987 |
m3 |
30 |
82 |
5000 |
6353 |
pavment |
construction |
road pothole patching, depression filling |
mē |
28 |
34 |
10000 |
0.000 |
ton |
193 |
287 |
1278 |
306781 |
pavment |
construction |
road pedestrial and bicycle (3 m) cover & other |
m |
2.5 |
2.8 |
10033 |
0.000 |
mē |
7.8 |
10.0 |
3000 |
26730 |
pavment |
construction |
road improvment ampliation |
cap |
8.3 |
14.4 |
2500 |
-11.620 |
m |
35 |
36 |
10000 |
358106 |
pavment |
construction |
road underground filling imported gravel |
cap |
0.711 |
2.416 |
2196 |
0.835 |
m3 |
5.2 |
5.4 |
106 |
3433 |
pavment |
construction |
road asphalt concrete bottom course construction 5 - 6 cms |
mē |
18 |
22 |
10000 |
0.000 |
ton |
129 |
156 |
1397 |
199260 |
pavment |
construction |
road asphalt milling, concrete pavement |
m |
0.80 |
1.11 |
10000 |
-8.229 |
mē |
7.5 |
10.1 |
10000 |
88031 |
pavment |
construction |
road granular subbase |
cap |
7.1 |
24.2 |
6210 |
0.011 |
m |
95 |
97 |
1000 |
97075 |
pavment |
construction |
road pothole patching |
m |
29 |
30 |
10000 |
-0.038 |
mē |
28 |
34 |
10000 |
306781 |
pavment |
construction |
asphalt cold recycling 6cm |
m |
0.95 |
2.94 |
10000 |
-8.193 |
mē |
8.9 |
26.9 |
10000 |
178854 |
pavment |
construction |
road concrete |
m |
3.7 |
5.0 |
50000 |
-0.513 |
m |
47 |
58 |
6290 |
329607 |
pavment |
construction |
asphalt & application |
mē |
29 |
47 |
10000 |
0.000 |
ton |
142 |
323 |
1633 |
379800 |
pavment |
construction |
asphalt concrete joints milling crack sealing with bitumen |
m |
1.2 |
3.4 |
10000 |
-3.245 |
mē |
7.8 |
12.0 |
10000 |
117919 |
pavment |
construction |
road excavation & preparation |
m |
77 |
81 |
3000 |
-3.667 |
mē |
71 |
76 |
15000 |
1105575 |
pavment |
construction |
road 6 highway remixed |
m |
12 |
13 |
18965 |
0.000 |
m |
188 |
169 |
1293 |
230710 |
pavment |
construction |
road steel structure |
m |
0.629 |
0.672 |
12630 |
0.000 |
mē |
0.730 |
0.913 |
10000 |
8213 |
pavment |
construction |
road soil equiped area |
cap |
10 |
24 |
870 |
0.838 |
mē |
3.2 |
3.3 |
746 |
14802 |
pavment |
construction |
building sum. hot mix asphalt application |
cap |
0.505 |
0.551 |
16907 |
0.000 |
ton |
6.0 |
6.0 |
1500 |
8925 |
pavment |
construction |
concrete pavment & street sides |
m |
25 |
27 |
10000 |
0.000 |
m3 |
77 |
99 |
2959 |
259995 |
pavment |
construction |
road 4 ways prefinish |
m |
70 |
75 |
5869 |
0.040 |
mē |
1.5 |
1.8 |
250000 |
425536 |
pavment |
construction |
road raised area 20cms layers construction |
m |
0.383 |
0.422 |
10000 |
0.000 |
mē |
1.3 |
1.4 |
2881 |
4026 |
pavment |
construction |
road highway 6 highway cover full |
m |
20 |
22 |
18965 |
0.000 |
mē |
23 |
30 |
15000 |
398498 |
pavment |
construction |
road 8 m remixed |
m |
3.6 |
4.9 |
50000 |
0.274 |
m 4 ways |
59 |
65 |
2500 |
152868 |
pavment |
construction |
road single surface dressing |
cap |
4.4 |
7.5 |
14654 |
0.000 |
mē |
5.1 |
12.3 |
10000 |
87037 |
pavment |
construction |
road asphalt cold mix mediums |
m |
1.6 |
1.8 |
12650 |
0.000 |
mē |
1.8 |
2.4 |
10000 |
21162 |
pavment |
construction |
road asphaltic hot mixed & adherence |
m |
1.2 |
1.3 |
11696 |
0.000 |
ton |
13 |
15 |
1034 |
14591 |
pavment |
construction |
road local (6 m) asphalt cover on gravel |
m |
1.3 |
1.4 |
10000 |
-5.552 |
mē |
8.6 |
9.3 |
10000 |
89301 |
pavment |
construction |
road asphalt concrete levelling course construction 3 - 6cms |
mē |
10 |
25 |
10000 |
0.000 |
ton |
12 |
162 |
2030 |
176256 |
pavment |
construction |
asphalt remix technology (milling+hot mix) |
m |
1.8 |
1.8 |
10000 |
-8.244 |
mē |
17 |
17 |
10000 |
167585 |
pavment |
construction |
roads double surface |
cap |
7.4 |
15.5 |
15186 |
0.000 |
mē |
8.6 |
26.2 |
10000 |
174316 |
pavment |
construction |
road plan of trailor 10cms thick |
cap |
5.4 |
13.7 |
6175 |
0.832 |
mē |
3.3 |
3.6 |
2880 |
58756 |
pavment |
construction |
road stone 2 layers10 cms main road (10 m - 7.2 m width) |
m |
0.98 |
1.08 |
26784 |
0.000 |
mē |
2.5 |
3.0 |
10000 |
27560 |
pavment |
funcional |
pavment pcc 25cms thick |
mē |
4.2 |
4.2 |
29544 |
-0.073 |
m3 |
90 |
206 |
900 |
123936 |
road transport |
construction |
park reforestation roadsides |
cap |
4.7 |
9.4 |
835 |
0.900 |
mē |
0.099 |
0.137 |
5000 |
5886 |
road transport |
funcional |
transport work |
cap |
141 |
172 |
835 |
0.900 |
mē |
2.2 |
3.0 |
5000 |
130795 |
road transport |
funcional |
roads common public spending on |
cap |
254 |
468 |
6144 |
0.000 |
mē |
240 |
293 |
8333 |
2219852 |
road transport |
funcional |
road 4 ways maintenance |
cap |
104 |
209 |
8192 |
0.898 |
/ cap.year.km |
5.0 |
5.5 |
25000 |
128294 |
roads side equipment |
construction |
concrete boxes, protection ducts, opening, drain |
cap |
13 |
16 |
5000 |
0.000 |
m3 |
130 |
167 |
500 |
74337 |
roads side equipment |
construction |
road side & pathway |
m |
45 |
55 |
1000 |
0.000 |
mē |
1.4 |
1.4 |
36000 |
49599 |
roads side equipment |
construction |
drain shell |
cap |
26 |
53 |
205 |
0.784 |
unit |
96 |
162 |
14 |
8122 |
roads side equipment |
construction |
sewage road culvert drain small |
cap |
105 |
195 |
156 |
0.797 |
m3 |
194 |
298 |
19 |
23504 |
roads side equipment |
construction |
concrete drains, culverts |
cap |
64 |
78 |
10000 |
0.000 |
m3 |
118 |
119 |
6000 |
709730 |
roads side equipment |
construction |
road tunnel of services |
cap |
14 |
17 |
15000 |
0.000 |
m |
23 |
24 |
10000 |
237675 |
roads side equipment |
construction |
road pipe polyethylene pipe 30cms |
m |
14 |
21 |
875 |
-3.986 |
km |
137046 |
167501 |
0.50 |
76137 |
roads side equipment |
construction |
box of perforation 2'x6'' 4 ways road |
m |
90 |
119 |
281 |
-4.359 |
km |
4.8 |
5.9 |
29306 |
157059 |
roads side equipment |
construction |
road side fence vial 4 ways road |
m |
2.0 |
2.2 |
2000 |
0.000 |
km |
3799 |
4643 |
1.0 |
4221 |
roads side equipment |
construction |
road access primary with control hydrologic |
cap |
3.1 |
3.8 |
15000 |
0.000 |
m |
5.2 |
5.3 |
10000 |
52467 |
roads side equipment |
construction |
road planting |
m |
50 |
61 |
1000 |
0.000 |
mē |
1.5 |
1.6 |
36000 |
55896 |