Energy Indicative Costs for Democratic Management (page 4/ 5) |
||||||||||||
Type of cost |
cost for |
concept |
lower Unit |
low cost low/u |
low cost high/u |
low unit quantity |
Discrepancy left/right |
high unit |
High cost /u low |
High cost /u high |
High unit quantity |
Suggested amount to work with |
hydro powerplant |
construction |
hydro electric plant investment pump reserve |
cap |
21 |
26 |
50 |
0.000 |
kW |
7.3 |
12.1 |
123 |
1184 |
hydro powerplant |
construction |
hydro electric plant investment medium traditional |
cap |
684 |
836 |
3000 |
0.000 |
kW |
22 |
44 |
69522 |
2281055 |
hydro powerplant |
construction |
microturbine |
cap |
405 |
526 |
500 |
-15.532 |
kW |
990 |
3300 |
1794 |
2040447 |
hydro powerplant |
construction |
hydro electric heritage |
kW |
28 |
33 |
50000 |
0.000 |
MWyear |
3431 |
4194 |
400 |
1525000 |
hydro powerplant |
construction |
hydro electric micro |
kW |
130 |
276 |
2000 |
0.600 |
MWyear |
49 |
60 |
3000 |
162389 |
hydro powerplant |
construction |
hydro electric dam Brazil |
cap |
616 |
753 |
750000 |
-0.111 |
kW |
23 |
36 |
19476225 |
570263867 |
hydro powerplant |
construction |
hydro electric hyperlarge dam |
mē |
258 |
315 |
25500000 |
-8.046 |
m3 |
1852 |
3335 |
25500000 |
7310302521 |
hydro powerplant |
construction |
hydro electric plant investment high traditional |
kW |
44 |
47 |
25000 |
0.000 |
m3 |
4149 |
4521 |
261 |
1130349 |
hydro powerplant |
construction |
hydro electric plant investment sea waves/tide |
cap |
97 |
118 |
50 |
0.000 |
kW |
44 |
63 |
101 |
5361 |
hydro powerplant |
construction |
hydro electric micro (Kaplan turbine) |
cap |
114 |
140 |
1500 |
0.000 |
kW |
117 |
646 |
500 |
190756 |
hydro powerplant |
construction |
hydro electric small plant |
kW |
2158 |
2418 |
5 |
-2.364 |
mwh |
5.0 |
6.1 |
6921 |
28081 |
hydro powerplant |
construction |
energy tide & wave |
kW |
466 |
1166 |
0 |
0.553 |
watt / tide |
22 |
24 |
3.2 |
70 |
hydro powerplant |
construction |
hydro electric plant investment low traditional |
cap |
32 |
39 |
50 |
0.000 |
kW |
10 |
26 |
100 |
1786 |
hydro powerplant |
construction |
hydro electric |
cap |
125 |
378 |
76 |
0.000 |
kW |
77 |
417 |
77 |
19077 |
hydro powerplant |
construction |
hydro electric micro-meso |
kW |
130 |
718 |
9000 |
0.000 |
mwh |
171681 |
209832 |
20 |
3815125 |
solar powerplant |
construction |
hot temperate dry sun energy |
cap |
1288 |
5106 |
5 |
0.000 |
kwh/mē |
575 |
703 |
25 |
15986 |
solar powerplant |
construction |
solar central thermal production & large cities power potential (London to Cairo) |
cap |
469 |
3594 |
10354 |
0.000 |
kw/ m2 |
2752 |
6420 |
4586 |
21031514 |
solar powerplant |
construction |
thermosolar (electrical) microthermal, hybrid |
cap |
1350 |
1650 |
5 |
0.000 |
mw/y |
1000 |
1143 |
7.0 |
7500 |
solar powerplant |
construction |
energy photovoltaic home system all |
kw |
792 |
4500 |
328 |
0.000 |
mwh/year |
5919 |
7986 |
125 |
869043 |
solar powerplant |
construction |
solar roof top pv |
cap |
400 |
1000 |
5 |
-3.286 |
kw |
792 |
4500 |
5.7 |
17656 |
solar powerplant |
construction |
energy photovoltaic central production |
kw/cap |
2752 |
9172 |
500 |
0.938 |
mē / kwh |
512 |
625 |
324 |
184127 |
solar powerplant |
construction |
thermosolar (electrical) conventional |
cap |
1275 |
1558 |
141 |
0.000 |
mw/y |
3000 |
3667 |
60 |
200000 |
solar powerplant |
construction |
solar pv ground based |
kw |
200 |
500 |
131 |
0.000 |
mwh |
15923 |
19462 |
2.6 |
46000 |
solar powerplant |
funcional |
sun energy temperate cold country |
cap |
14815 |
39093 |
4 |
0.000 |
mē |
1294 |
1581 |
75 |
107815 |
solar powerplant |
funcional |
solar pump 1kw average sun |
kw/mē |
351 |
649 |
100 |
0.000 |
m3day |
1800 |
2200 |
25 |
49992 |
solar powerplant |
funcional |
sun energy sunny coast |
cap |
3951 |
10425 |
4 |
0.000 |
mē |
1294 |
1581 |
20 |
28751 |
solar powerplant |
funcional |
sun energy dry desert |
cap |
988 |
2606 |
4 |
0.000 |
mē |
1294 |
1581 |
5.0 |
7188 |
solar powerplant |
funcional |
survey space applications electric power |
cap |
3.6 |
4.4 |
500 |
0.000 |
mw |
1.000 |
7.000 |
500 |
2000 |
solar powerplant |
funcional |
sun energy temperate climate |
mē |
0.321 |
0.755 |
50 |
0.000 |
mwh/year.mē |
1.5 |
1.7 |
17 |
27 |
solar powerplant |
funcional |
sun energy hot humid coast |
cap |
1975 |
5212 |
4 |
0.000 |
mē |
1294 |
1581 |
10 |
14375 |
solar powerplant |
funcional |
solar pump |
mē all area |
110 |
129 |
2500 |
-0.018 |
mē useful area |
70 |
65 |
4500 |
298458 |
wind energy |
construction |
windmills on field civil engineering |
kw |
4058 |
7103 |
20 |
0.000 |
/turbine on field |
5509 |
5671 |
20 |
111801 |
wind energy |
construction |
wind turbine all big |
kw |
900 |
934 |
1500 |
1.000 |
mwh |
72 |
107 |
1.5 |
1375771 |
wind energy |
construction |
windmills on field turbine |
kw |
900 |
898 |
20 |
-0.508 |
turbine on field |
1221 |
1492 |
20 |
27123 |
wind energy |
construction |
windmills on field |
kw |
1033 |
1808 |
90 |
0.777 |
GWh/year |
10245 |
12522 |
2.5 |
28459 |
wind energy |
construction |
wind turbine |
turbine electric |
13090 |
13745 |
1 |
-1.379 |
turbine generator |
31148 |
32705 |
1.0 |
45344 |
wind energy |
construction |
windmills on field electric engineering |
kw |
376 |
659 |
20 |
-9.000 |
turbine on field |
5104 |
5266 |
20 |
10370 |
wind energy |
construction |
wind turbine |
turbine blades |
45902 |
48197 |
1 |
-0.786 |
/turbine gear box |
81967 |
86066 |
1.0 |
131066 |
wind energy |
construction |
windmills on field network connection |
kw |
245 |
429 |
200 |
-0.003 |
/turbine on field |
3356 |
3403 |
20 |
67582 |
wind energy |
construction |
windmills field morroco around 100mw |
Mw |
1380 |
1884 |
100 |
0.999 |
mwh |
72 |
107 |
1.5 |
163188 |
wind energy |
construction |
wind central production |
kw |
1284 |
4586 |
76 |
0.999 |
mwh |
72 |
107 |
1.5 |
223857 |
wind energy |
construction |
wind turbine all |
kw |
900 |
934 |
660 |
1.000 |
mwh |
72 |
107 |
1.5 |
50000 |
wind energy |
funcional |
wind turbine small 2.5 - 3 kw; 3 - 4 m, wind 5m/sec |
cap |
648 |
792 |
500 |
0.000 |
unit |
30000 |
42000 |
10 |
360000 |