Typical Construction Labor Hours and Bare Cost by Components |
||||||||||||||||||
|
|
|
labor bare cost |
labor bare cost |
labor hours |
labor bare cost |
labor hours |
labor bare cost |
labor hours |
labor bare cost |
labor hours |
|||||||
Division |
|
|
single family house |
town house |
town house |
apt. buil -ding |
apt. building |
office buil -ding |
office building |
department store
|
department store |
|||||||
1 |
general requirements (administration) |
|
|
0 |
0 |
|
485 |
0.003 |
151 |
0 |
0 |
|||||||
2 |
site construction (excavation drainage) |
|
0.03 |
0.037 |
101 |
0.004 |
592 |
0.008 |
506 |
0.019 |
1320 |
|||||||
3 |
concrete |
|
0.031 |
0.03 |
89 |
0.091 |
10868 |
0.141 |
8294 |
0.147 |
9007 |
|||||||
4 |
masonry |
|
0.051 |
0.054 |
161 |
0.041 |
5257 |
0.075 |
4988 |
0.08 |
5299 |
|||||||
5 |
metals (structural framing, etc.) |
|
0 |
0 |
5050 |
0.049 |
5075 |
0.053 |
2117 |
0.047 |
2522 |
|||||||
6 |
wood and plastic |
|
0.269 |
0.229 |
199 |
0.006 |
735 |
0.007 |
411 |
0.006 |
378 |
|||||||
7 |
thermal & moisture protection |
|
0.101 |
0.085 |
119 |
0.018 |
2448 |
0.026 |
1700 |
0.066 |
4631 |
|||||||
8 |
doors & windows |
|
0.062 |
0.052 |
782 |
0.058 |
6771 |
0.03 |
1590 |
0.021 |
1294 |
|||||||
9 |
finishes (plaster, ceiling, flooring, paint) |
|
0.317 |
0.323 |
71 |
0.239 |
29772 |
0.151 |
9048 |
0.27 |
18693 |
|||||||
10 |
specialties |
|
|
|
0 |
|
0 |
0.004 |
256 |
|
0 |
|||||||
11 |
equipment |
|
|
|
0 |
|
0 |
|
0 |
|
0 |
|||||||
12 |
furnishings |
|
|
|
0 |
|
0 |
|
0 |
|
0 |
|||||||
13 |
special construction |
|
|
|
0 |
|
784 |
0.003 |
165 |
|
380 |
|||||||
14 |
conveying systems (elevators, etc.) |
|
0 |
0 |
0 |
0.073 |
7077 |
0.1211 |
5714 |
0 |
0 |
|||||||
15 |
mechanical (plumbing, HVAC, etc.) |
|
0.087 |
0.097 |
216 |
0.286 |
30710 |
0.178 |
7680 |
0.161 |
9148 |
|||||||
16 |
electrical |
|
0.057 |
0.066 |
138 |
0.123 |
12271 |
0.199 |
9665 |
0.177 |
9085 |
|||||||
Poor Africa popular (but professional) construction costs |
||||||||||||||||||
|
unit |
unit costs |
quantity used (/m3 wall produced) |
cost/m3 wall produced |
propor tion |
unskill daily labor wage |
3.07 |
|||||||||||
cement |
bag |
9.76 |
0.28 |
2.68 |
0.18 |
foreman wage/day |
17.72 |
|||||||||||
sand |
m3 |
8.47 |
0.03 |
0.29 |
0.02 |
skilled construction labor/day |
17.54 |
|||||||||||
aggregate |
m3 |
24.96 |
0.01 |
0.22 |
0.01 |
cement cost/50kg |
13.35 |
|||||||||||
6mm re-bar |
m |
0.26 |
0.63 |
0.17 |
0.01 |
sand cost/t |
30.98 |
|||||||||||
binding wire |
kg |
1.55 |
0.25 |
0.39 |
0.03 |
soil cost/t |
12.78 |
|||||||||||
motocycle tubes |
each |
0.03 |
1.25 |
0.04 |
0 |
machine cost |
696.98 |
|||||||||||
polythene |
m2 |
0.25 |
1.25 |
0.31 |
0.02 |
cost/m2 wall large size soil/cement compacted |
11.72 |
|||||||||||
basin |
each |
3.1 |
0.13 |
0.39 |
0.03 |
cost/m2 wall large size sandcrete blocks |
7.81 |
|||||||||||
24" inner tube |
each |
2.44 |
0.13 |
0.3 |
0.02 |
cost/m2 wall large size burnt bricks |
16.87 |
|||||||||||
labor skilled |
day |
6.24 |
0.44 |
2.73 |
0.18 |
cost/m2 wall large size quarry stone |
12.22 |
|||||||||||
labor unskilled |
day |
3.13 |
1.63 |
5.08 |
0.34 |
Housing cost |
||||||||||||
1 1/2" pipe |
m |
1.73 |
0.44 |
0.76 |
0.05 |
Components |
proportion |
US$ 2009 |
||||||||||
1 1/4" pipe |
m |
1.74 |
0.4 |
0.69 |
0.05 |
wood structure |
0.32 |
10.58 |
||||||||||
1 1/2" tee |
each |
2.53 |
0.13 |
0.32 |
0.02 |
roof cover |
0.19 |
0.96 |
||||||||||
1/2" pipe |
m |
0.23 |
0.03 |
0.01 |
0 |
carpentry |
0.13 |
0.64 |
||||||||||
wood (2.2) |
m |
0.47 |
0.01 |
0.01 |
0 |
hygiene equipment |
0.04 |
0.18 |
||||||||||
wood screw |
each |
0.03 |
0.25 |
0.01 |
0 |
finish |
0.05 |
0.23 |
||||||||||
labor skilled |
|
6.24 |
0.06 |
0.39 |
0.03 |
transports |
0.08 |
0.4 |
||||||||||
Construction non productive labor |
|
|
14.77 |
|
tool |
0.02 |
0.1 |
|||||||||||
construction |
0.40 |
Construction national Sectors |
legal work |
0.02 |
0.1 |
|||||||||||||
administrative delays |
0.20 |
year construction production/ capita |
proportion GNP |
labour cost index |
|
technical direction |
0.17 |
0.84 |
||||||||||
inefficiency of methods |
0.40 |
France |
12435 |
0.1 |
113 |
cost by m3 volume of construction |
14.03 |
|||||||||||
rlabour restrictions and other |
0.15 |
Germany |
17555 |
0.1 |
124 |
|
|
|
||||||||||
private times |
0.05 |
Italy |
10972 |
0.1 |
|
|
|
|
||||||||||
inappropriate temperature conditionning |
0.06 |
Great Britain |
7315 |
0.1 |
100 |
|
|
|
||||||||||
relative energetic gain |
0.08 |
Russia |
2194 |
0.1 |
|
|
|
|
||||||||||
|
|
Turquia |
5120 |
0.1 |
|
|
|
|