Simple Guide for Resettlement Program: Green (Re)building

(numbers as 2009 US$ example) - anfm -

Kitchen/Cooking Sub system

Family Prototype

Water catchment subsystem

sink/washbasin bottom, faucet, hardware

m2 & unit

143

basic shelter prototype

family scale

9m2/cap

7150

roof gutters(piece, seal ...)

m

143

solar water heater

m2

430

basic solar kitchen (all components) family scale

/cap

1430

filtering system, diverters, screen


143

solar shower

m2

430

water catchment (all components) family scale

/cap

1430

rainwater cisterns

m3

143

solar box cooker

m2

430

waste handling sewage &grey water (all components) family scale

/cap

475

solar water pump

m3

715

solar still

m2

572

photo voltaic system (all components) family scale

/cap

955

Waste handling & greywater sub-systems

solar food dryer

m2

430

Integrated food production subsystem

composting privy

m2

715

solar refrigerator

m2

1716

aquaculture system complete fish tank

m3

1200

kitchen, garden & animal waste composting

m2

286

community facilities infrastructures

poultry farming

starting set

430

trickle filter and living fence

m2

429

micro factory (building facility)


64350

vertical food growers

100m2

143


community meeting center


28600

composting

training /cap

143

architectural & engineering design


14300

library multimediacenter


57200

Group Shelter

consultants solar &aquaculture


14300

chidl care center


38610

Basic shelter

50

100000

Laboratory & field testing


14300

wind electric system installed

10kW

22880

Basic solar kitchen

16 unit /50cap

9152

tools


11440

transportation vehicles


22800

Waster handling, sewage & grey water

16 unit / 50cap

4580

documentation


1430

site landscape work


71500

water catchment

50

7150

construction supervisor


17160


photovoltaic electricity

25

43000




site preparation


430

food production


14300




foundations


430

Water distribution

metallic with tight closure

1 for 4 - 8 tent or 25-30 people ●

Water reserve:

Water disinfection:

waterproof cover of 30cms above and 3 m below ground level ● concrete platform around well: 1m ● enclosure protection of well: 50m radius ●

bottom of pit latrine/ventilated pit: 1,5 - 3m above aquifer

Earthquake Buildings and Savings for Improvement

building structure


28600

cost effective technology

in place of conventional options

proportion of savings

thermal & moisture protection


2860

piles foundations

traditional stone/ brick

0.15

doors & windows


715

brick arch foundations

footings

0.25

exterior finishes


575

180mm thick wall in bricks

230 mm brick walls

0.13

interior finishes


430

Fly ash brick wall

Clay brick wall

0.25

mechanical


715

hollow block walls

solid masonry

0.2

Emergency Camp Minimum Checklist Camp for 1000 people

Space:

minimum distance between tent nail and pathway: 2m ● minimum distance between tents: 8m ● minimum floor area in each tent/person 3m2 ●

Buildings:

minimum distance between beds: 0,75m

85mm thick sloping RCC

110mm RCC

0.3

waffle roofing

RCC

0.15

microconcrete

Clay tile roofing, AC sheet roofing

0.15

ferrocement manhole cover

casion / concrete

0.45

ferrocement water tank

rigid PVC

0.6

Hygien & Waste

5-6 seats for each 100 people ● distance from tent: 30 - 50m ● Self hygien handwash, both side use 3m length, 2 for 100 people Self hygien ● handwasher 1/ 10persons ● 1 shower/50 persons in temperate climate or 1/30 persons in hot climate ● male/female separated toilets waterclosets ● 1 seat/25 women; 1 seat &1 urinal / 35 men ●