Simple Guide for Resettlement Program: Green (Re)building (numbers as 2009 US$ example) - anfm -  | 
    ||||||||
Kitchen/Cooking Sub system  | 
      Family Prototype  | 
      Water catchment subsystem  | 
    ||||||
sink/washbasin bottom, faucet, hardware  | 
      m2 & unit  | 
      143  | 
      basic shelter prototype family scale  | 
      9m2/cap  | 
      7150  | 
      roof gutters(piece, seal ...)  | 
      m  | 
      143  | 
    
solar water heater  | 
      m2  | 
      430  | 
      basic solar kitchen (all components) family scale  | 
      /cap  | 
      1430  | 
      filtering system, diverters, screen  | 
      
  | 
      143  | 
    
solar shower  | 
      m2  | 
      430  | 
      water catchment (all components) family scale  | 
      /cap  | 
      1430  | 
      rainwater cisterns  | 
      m3  | 
      143  | 
    
solar box cooker  | 
      m2  | 
      430  | 
      waste handling sewage &grey water (all components) family scale  | 
      /cap  | 
      475  | 
      solar water pump  | 
      m3  | 
      715  | 
    
solar still  | 
      m2  | 
      572  | 
      photo voltaic system (all components) family scale  | 
      /cap  | 
      955  | 
      Waste handling & greywater sub-systems  | 
    ||
solar food dryer  | 
      m2  | 
      430  | 
      Integrated food production subsystem  | 
      composting privy  | 
      m2  | 
      715  | 
    ||
solar refrigerator  | 
      m2  | 
      1716  | 
      aquaculture system complete fish tank  | 
      m3  | 
      1200  | 
      kitchen, garden & animal waste composting  | 
      m2  | 
      286  | 
    
community facilities infrastructures  | 
      poultry farming  | 
      starting set  | 
      430  | 
      trickle filter and living fence  | 
      m2  | 
      429  | 
    ||
micro factory (building facility)  | 
      
  | 
      64350  | 
      vertical food growers  | 
      100m2  | 
      143  | 
      
  | 
    ||
community meeting center  | 
      
  | 
      28600  | 
      composting  | 
      training /cap  | 
      143  | 
      architectural & engineering design  | 
      
  | 
      14300  | 
    
library multimediacenter  | 
      
  | 
      57200  | 
      Group Shelter  | 
      consultants solar &aquaculture  | 
      
  | 
      14300  | 
    ||
chidl care center  | 
      
  | 
      38610  | 
      Basic shelter  | 
      50  | 
      100000  | 
      Laboratory & field testing  | 
      
  | 
      14300  | 
    
wind electric system installed  | 
      10kW  | 
      22880  | 
      Basic solar kitchen  | 
      16 unit /50cap  | 
      9152  | 
      tools  | 
      
  | 
      11440  | 
    
transportation vehicles  | 
      
  | 
      22800  | 
      Waster handling, sewage & grey water  | 
      16 unit / 50cap  | 
      4580  | 
      documentation  | 
      
  | 
      1430  | 
    
site landscape work  | 
      
  | 
      71500  | 
      water catchment  | 
      50  | 
      7150  | 
      construction supervisor  | 
      
  | 
      17160  | 
    
  | 
      photovoltaic electricity  | 
      25  | 
      43000  | 
      
  | 
      
  | 
      
  | 
    ||
site preparation  | 
      
  | 
      430  | 
      food production  | 
      
  | 
      14300  | 
      
  | 
      
  | 
      
  | 
    
foundations  | 
      
  | 
      430  | 
      Water distribution metallic with tight closure 1 for 4 - 8 tent or 25-30 people ● Water reserve: Water disinfection: waterproof cover of 30cms above and 3 m below ground level ● concrete platform around well: 1m ● enclosure protection of well: 50m radius ● bottom of pit latrine/ventilated pit: 1,5 - 3m above aquifer  | 
      Earthquake Buildings and Savings for Improvement  | 
    ||||
building structure  | 
      
  | 
      28600  | 
      cost effective technology  | 
      in place of conventional options  | 
      proportion of savings  | 
    |||
thermal & moisture protection  | 
      
  | 
      2860  | 
      piles foundations  | 
      traditional stone/ brick  | 
      0.15  | 
    |||
doors & windows  | 
      
  | 
      715  | 
      brick arch foundations  | 
      footings  | 
      0.25  | 
    |||
exterior finishes  | 
      
  | 
      575  | 
      180mm thick wall in bricks  | 
      230 mm brick walls  | 
      0.13  | 
    |||
interior finishes  | 
      
  | 
      430  | 
      Fly ash brick wall  | 
      Clay brick wall  | 
      0.25  | 
    |||
mechanical  | 
      
  | 
      715  | 
      hollow block walls  | 
      solid masonry  | 
      0.2  | 
    |||
Emergency Camp Minimum Checklist Camp for 1000 people Space: minimum distance between tent nail and pathway: 2m ● minimum distance between tents: 8m ● minimum floor area in each tent/person 3m2 ● Buildings: minimum distance between beds: 0,75m  | 
      85mm thick sloping RCC  | 
      110mm RCC  | 
      0.3  | 
    |||||
waffle roofing  | 
      RCC  | 
      0.15  | 
    ||||||
microconcrete  | 
      Clay tile roofing, AC sheet roofing  | 
      0.15  | 
    ||||||
ferrocement manhole cover  | 
      casion / concrete  | 
      0.45  | 
    ||||||
ferrocement water tank  | 
      rigid PVC  | 
      0.6  | 
    ||||||
Hygien & Waste 5-6 seats for each 100 people ● distance from tent: 30 - 50m ● Self hygien handwash, both side use 3m length, 2 for 100 people Self hygien ● handwasher 1/ 10persons ● 1 shower/50 persons in temperate climate or 1/30 persons in hot climate ● male/female separated toilets waterclosets ● 1 seat/25 women; 1 seat &1 urinal / 35 men ●  | 
    ||||||||